Shelter is a basic human need and everyone needs to have a home.
The single largest investment in our lives is in a home.
Structural insulated Panel House at Chinese Road contractors Offices opposite Warren Concrete at Kasarani, Nairobi
Structural insulated Panel House at Chinese Road contractors Offices opposite Warren Concrete at Kasarani, Nairobi
However, several factors have pushed up the cost of a decent home very high in Kenya.
We have come up with the Prefabricated House solution to challenge this situation and make decent housing available to all.
Use of prefabricated technology whereby the house is prefabricated in a factory greatly saves on materials in that the customer only pays for the used materials as opposed to the normal traditional method whereby a lot of material is wasted on site.
Prefabricated technology also saves in labor since the house parts are easily fastened to each other during installation.The quality of construction is also kept high since the houses are made in an ISO 9000 2000 certified factory as opposed to the normal traditional method whereby the quality of construction and workmanship is not easily determined until the building is completed.
We use current global building technological advances, mainly Structural Insulated Panels on structural steel structures for wall, roof and floor. Structural Insulated Panels are made of two steel panels with polyurethane form insulation in between them and come in panels of 1.2 meters by 2.4 meters.
Read more on
http://www.a4architect.c...housing-pre-built-homes/As Iron Sharpens Iron, So one Man Sharpens Another.