Flo-ology wrote:dunkang wrote:Flo-ology wrote:Surething wrote:The rumored greater eastern bypass is being used by sellers all the way from Mombasa road to Kangundo road and Thika to sell their parcels at a premium.. The Eastern bypass is already slated for expansion to a dual carriageway which should give the area currently plagued by jams a 'Thika Road' effect.
Eastern bypass dualling making senses but greater eastern bypass will take some time, may be 10 years. Has EIA and design been done on Greater Eastern by pass?
Yes. They were done by NORKEN some 4 years ago and even the road wayleave pegged (beaconed),
LINK What comes first, feasibility Study or EIA? The status shows feasibility study and design ongoing
The Feasibility Study, E&SIA, Detailed Design and Pegging of the Wayleave was done and completed in 2013.
That website has not been updated since January 2013 as you can see the Kiserian Sewerage Project still reads On-Going, yet they completed the designs in 2012 and Construction is ongoing under supervision of Gath & Losai JV.
As for the sequence of event, its as follows;
DESIGN PHASEi. Feasibility Study as well as E&SIA scoping/screening
ii. Project Report and ToR for carrying out E&SIA to NEMA
iii. If there are significant project E&S issues, NEMA gives green light for a full E&SIA to be undertaken
iv. Topographical Surveys and Geotechnical Investigations etc are carried out
v. Detailed Design and Preparation of Tender Documents
CONSTRUCTION PHASEi. Design Review (To update the drawings and E&SIA reports)
ii. Construction
iii. Commissioning
iv. Defects Liability Period