Question for a4architect
nostoppingthis
#571 Posted : Thursday, October 03, 2013 7:47:13 PM
Rank: Chief

Joined: 8/24/2009
Posts: 5,909
Location: Nairobi
Mukiri wrote:
Please talk abit about Containers converted into houses/accommodations. Any links?


@Mukiri, are you interested in an architect for this?
Mukiri
#572 Posted : Friday, October 04, 2013 2:40:51 AM
Rank: Elder

Joined: 7/11/2012
Posts: 5,222
nostoppingthis wrote:
Mukiri wrote:
Please talk abit about Containers converted into houses/accommodations. Any links?


@Mukiri, are you interested in an architect for this?

I'm toying with the idea. But Im green and would like to know a thing or two before I talk to a professional.

Proverbs 19:21
a4architect.com
#573 Posted : Saturday, October 05, 2013 11:44:47 AM
Rank: Veteran

Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@mukiri, check here for container housing in kenya info. Its more expensive than the regular low cost bungalow cost of kes 20k per m2.

http://www.a4architect.c...n-kenya-cost-comparison/
As Iron Sharpens Iron, So one Man Sharpens Another.
sysdevPM
#574 Posted : Sunday, October 06, 2013 7:15:54 PM
Rank: New-farer

Joined: 6/14/2011
Posts: 32
Location: nairobi
Foz00 wrote:
@GGK & keke2 - thank you for the response, got a quote of KSh 15 per cubic feet as of yesterday at 8' no signs of rock yet. Site was a quarry in the 50's rock is around 40'.

Hello foz00
Is it possible to get the contacts of the guys who did your septic ? I am getting quotes of minimum of kshs 50 per cubic foot .

Foz00
#575 Posted : Monday, October 07, 2013 11:30:09 AM
Rank: Member

Joined: 1/13/2011
Posts: 297
Location: Nairobi
sysdevPM wrote:
Foz00 wrote:
@GGK & keke2 - thank you for the response, got a quote of KSh 15 per cubic feet as of yesterday at 8' no signs of rock yet. Site was a quarry in the 50's rock is around 40'.

Hello foz00
Is it possible to get the contacts of the guys who did your septic ? I am getting quotes of minimum of kshs 50 per cubic foot .


Currently they are at a friends doing water tank. Where is your site and is it rock?
kyt
#576 Posted : Friday, October 18, 2013 8:07:03 PM
Rank: Elder

Joined: 11/7/2007
Posts: 2,182
how much are the prices of y8, y12, y 10. and how many of them can be used in 60 by 30 feet slab.
LOVE WHAT YOU DO, DO WHAT YOU LOVE.
kyt
#577 Posted : Saturday, October 26, 2013 2:00:18 PM
Rank: Elder

Joined: 11/7/2007
Posts: 2,182
dear all what is the average ratio of labour cost and the total cost of building the building. can the cost of labour be more than the cost of materials at any one time?
LOVE WHAT YOU DO, DO WHAT YOU LOVE.
GGK
#578 Posted : Sunday, October 27, 2013 8:16:50 AM
Rank: Member

Joined: 11/21/2006
Posts: 608
Location: Ruiru
Cost of labour as % of total project depends on particular task. Masonry works tend to be around 25% whereas some tasks like electrical, plumbing & fittings may go as high as 50%.
"..I am because we are. "― Ubuntu, Umtu,
GGK
#579 Posted : Sunday, October 27, 2013 8:26:22 AM
Rank: Member

Joined: 11/21/2006
Posts: 608
Location: Ruiru
Mr Architect, apart from Bamburi, are there others that sell pre-mix concrete in Nairobi. I've a project where I need at least 4 quotations
"..I am because we are. "― Ubuntu, Umtu,
jaggernaut
#580 Posted : Sunday, October 27, 2013 2:27:32 PM
Rank: Elder

Joined: 10/9/2008
Posts: 5,389
@a4architect - what are the minimum room sizes (e.g. living room, bedroom, kitchen, WC, corridors etc) allowable by law for buildings in Nairobi? Even minimum house size? Is there a building code that one can refer to? Like this one i found for Australia RINK?
103 Pages«<5657585960>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2026 Wazua.co.ke. All Rights Reserved.