@Kaigangio,@ kanobi;
The installed capacity is 35MW...full-stop! Not 35MW per hour,or per year!!
Electricity is sold in kWh. 35MW is 35,000kW
Run the generator for one hour and you have supplied 35,000kWh of ENERGY
Run it for a year (non-stop) and you have supplied 365days x 24hours/day x 35,000Kwh = 306,600,000kWh of ENERGY.
MSC has committed to 85% availability,meaning 85% of this theoretical maximum = 260,610,000kWh of ENERGY
KPLC has committed to pay US$0.06 per kWh = sh2.5 per kWh
This gives sh625m pa
Finally,KPLC buys power by load-sharing...giving preference to the cheapest sources (hydro,geothermo,sugar). We have a 15% excess supply .
Thus best that MAC can look forward to is 85% of sh625m = sh530m
Knock off the sh300m finance cost and you are left with sh230m...or just 10cts in additional EPS
Not so enticing now!!!
====
Amazing how the picture changes when you do the figures accurately