ngapat wrote:I got a quotation of ksh 1,150,000 for a two bedroom residential house master ensuite (not storey). Feel like its on the higher side.
Plus whats the approximate cost to build a perimeter wall for a 100 by 100 ft plot
From basic principals again;
A. EXCAVATION FOR FOUNDATION (They come with tools)
A.1 - Fundi (1 day @ 1,200/-) = 1,200/-
A.2 - Watu wa mkono (3 guys @ 500/-) = 1,500/-
B. FOUNDATION (strip footing and foundation wall)
B.1 - Fundi (3 days @1,200/-) = 3,600/-
B.2 - Watu wa Mkono (3 guys, 3 days @500/-) = 4,500/-
B.3 - Foundation Stones (1,200ft @ 27/-) = 32,400/-
B.4 - Cement (50 bags @ 600/-) = 30,000/-
B.5 - River Sand (6 Tons @2,200/-) = 13,200/-
B.6 - Gravel (6 Tons @ 2,200/-) = 13,200/-
B.7 - Water (2,000 liters) = 2,000/-
B.8 - Transportation of materials = 10,000/-
C. SUPER-STRUCTURE WALL (Keyed only on one wall)
C.1 - Fundi (21 days @1,200/-) = 25,200/-
C.2 - Watu wa Mkono (6 guys, 21 days @500/-) = 63,000/-
C.3 - Ndarugu 6" Stones (4,400 pieces @ 20/-) = 88,000/-
C.4 - Cement (50 bags @ 600/-) = 30,000/-
C.5 - River Sand (11 Tons @2,200/-) = 24,200/-
C.6 - Water (3,000 liters) = 3,000/-
C.7 - Transportation of materials = 20,000/-
TOTAL ESTIMATED COST = KSHS. 365,000 Receive with simplicity everything that happens to you.” ― Rashi