Queen wrote:You may have to do a false roof not just above the staircase void but the entire first floor slab. The reason being a concrete slab is permeable so you should otherwise expect water leakage through the slab. Doing a maisonette in phases can be quite expensive.
A better mode of construction would entail doing the entire first floor walling including the roof. The finishes on first floor can follow later as you chill on the ground floor.
Excellent observation my sister. But shida ni pesa. I don't have enough to even fika the ring beam let alone the roof!
I was thinking just build a mini mabati roof over the staircase area and then move in. I never knew concrete slabs are permeable? Aren't some roof tiles also made of concrete? I would think a think suspended slab is virtually impermeable, and the water that seeps in and is retained is actually good for long term curing of the slab? Asanteni for the feedback.
6 years on..the second and only other Wazua Billionaire!! Mungu ni nguvu yetuππΎπ°πͺπ₯π₯!