obiero wrote:Gathige wrote:kawi254 wrote:obiero wrote:Possibility of funds embezzlement will be at an all time high, but if they manage even 50% of the forecast, Kenya will be a better place to live in " Out of this number, 800,000 affordable housing units will be delivered under public private partnerships (PPPS) while 200,000 will be social housing." What the above means is that GoK plans to build only 200,000 slum upgrading houses in Kibera, Mathare and any house you build privately in Syokimau, Kitengela or built by Erdeman or Suraya GoK will claim it in it's 5 year achievement. @kawi, Very true. 200,000 housing for GOK is a drop in the ocean. The housing problem can easily be addressed if both the central government and county governments addressed the infrastructural issues that hinder housing development. If new housing areas were opened up by providing infrastructure such as power, roads, water, sewer systems etc in designated areas, people would move in and even develop own structures. Kajiado and Machakos Counties alone cah house the whole of nbi but the infrastructure in non existent. Houses done on PPPS will not be affordable to the majority. Those buying expensive houses can still afford to build on their own. The rest have no means to buy, but if facilitated, they can own houses too. That is the sad reality.. Even most of the so called middle class cannot afford to build their own homes Building houses for people who are being retrenched as firms/industries downsize and other shutting down Wealth is built through a relatively simple equation Wealth=Income + Investments - Lifestyle
|
|
|
Rank: Elder Joined: 5/25/2012 Posts: 4,105 Location: 08c
|
@Obiero it's been a while with the updates Pesa Nane plans to be shilingi when he grows up.
|
|
|
Rank: Elder Joined: 6/23/2009 Posts: 14,338 Location: nairobi
|
Pesa Nane wrote:@Obiero it's been a while with the updates @pesanane Money dried up! Now at the second floor. Thinking of finishing up the completed units and getting tenants, then continue with construction of the two remaining floors later on COOP, IMH, KEGN, KQ, MTNU
|
|
|
Rank: Elder Joined: 5/25/2012 Posts: 4,105 Location: 08c
|
obiero wrote:Pesa Nane wrote:@Obiero it's been a while with the updates @pesanane Money dried up! Now at the second floor. Thinking of finishing up the completed units and getting tenants, then continue with construction of the two remaining floors later on  Victory belongs to those who dare; those who are brave. All the best & feel free to throw in a photo or two Pesa Nane plans to be shilingi when he grows up.
|
|
|
Rank: Elder Joined: 6/23/2009 Posts: 14,338 Location: nairobi
|
Pesa Nane wrote:obiero wrote:Pesa Nane wrote:@Obiero it's been a while with the updates @pesanane Money dried up! Now at the second floor. Thinking of finishing up the completed units and getting tenants, then continue with construction of the two remaining floors later on  Victory belongs to those who dare; those who are brave. All the best & feel free to throw in a photo or two Amen.. COOP, IMH, KEGN, KQ, MTNU
|
|
|
Rank: Elder Joined: 6/23/2009 Posts: 14,338 Location: nairobi
|
|
|
|
Rank: Elder Joined: 6/23/2009 Posts: 14,338 Location: nairobi
|
Started plaster and looking to effect finishing on ground units.. God is good  Bird's eye view from the second floor  COOP, IMH, KEGN, KQ, MTNU
|
|
|
Rank: Member Joined: 10/26/2008 Posts: 380
|
Good work..
You seem to be using only a small portion of the land - any specific reason for this?
Also, you mentioned view from second floor - can you share some newer photos?
|
|
|
Rank: Elder Joined: 6/23/2009 Posts: 14,338 Location: nairobi
|
Mkimwa wrote:Good work..
You seem to be using only a small portion of the land - any specific reason for this?
Also, you mentioned view from second floor - can you share some newer photos?
Asante @mkimwa.. The reason is because that's the first block of three as per pictorial below  COOP, IMH, KEGN, KQ, MTNU
|
|
|
Rank: Elder Joined: 6/23/2009 Posts: 14,338 Location: nairobi
|
Finishing up on the ground units.. Wakati wa plaster imefika   COOP, IMH, KEGN, KQ, MTNU
|
|
|
Wazua
»
Investor
»
Property
»
Low End Housing: High Risk, High Return
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|