Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
Impunity wrote:hardwood wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga May be the WB approved plan was the construction of a footbridge with escalators...but Jubilants made the "manual" staircase insptead and pocketed the change! If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.
|