Wazua
»
Club SK
»
Politics
»
#UhuruChallenge
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... If the world bank used 600m to fund the bridge, then go ask them how and why? They know why it cost 600m.
|
|
|
Rank: Chief Joined: 5/9/2007 Posts: 13,095
|
Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa?
|
|
|
Rank: Elder Joined: 4/22/2010 Posts: 11,522 Location: Nairobi
|
washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? It wouldnt be the first time... possunt quia posse videntur
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? Problem with kenyans including many hapa wazua is that they never use their brains. They just rely on rumours, including what bored housegirls are tweeting.
|
|
|
Rank: Elder Joined: 12/6/2008 Posts: 3,568
|
hardwood wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? Problem with kenyans including many hapa wazua is that they never use their brains. They just rely on rumours, including what bored housegirls are tweeting.  following teenage housegirls on twitter, or is it stalking, hawa watu wa odm saa zingine. Who has the time to cover a t.v with newspapers and tie slippers with strings and post for people to follow? Must be teenage housegirls as you say. Utoto ingine bwana! Ras Kienyeji Man
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
Much Know wrote:hardwood wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? Problem with kenyans including many hapa wazua is that they never use their brains. They just rely on rumours, including what bored housegirls are tweeting.  following teenage housegirls on twitter, or is it stalking, hawa watu wa odm saa zingine. Who has the time to cover a t.v with newspapers and tie slippers with strings and post for people to follow? Must be teenage housegirls as you say. Utoto ingine bwana! Very sad...
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
maka wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? It wouldnt be the first time... Tell us more. It's is only baba who once tried to steal from the world bank and the consequences were quite severe. No one steals from the WB. WB #HawatakiUjinga. https://www.standardmedi...-fire-over-missing-cash
|
|
|
Rank: Elder Joined: 12/6/2008 Posts: 3,568
|
hardwood wrote:maka wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? It wouldnt be the first time... Tell us more. It's is only baba who once tried to steal from the world bank and the consequences were quite severe. No one steals from the WB. WB #HawatakiUjinga. https://www.standardmedi...-fire-over-missing-cash
IF i could have only gotten a grant of 500K for our company when they were hogging this billions with their relatives, we would have changed Kenya, at least moved many out of poverty, now some wazungus "strangers" are the ones helping us develop technology in Kenya, what Kenyan youth are using to develop technology in Kenya are purely donations and dont amount to more than 100 million! Imagine! The rest is eaten by "very clever" people like odm politicians and their close relatives, girlfriends and maids, just eaten! At Kempiski! Ras Kienyeji Man
|
|
|
Rank: Elder Joined: 3/2/2009 Posts: 26,330 Location: Masada
|
hardwood wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga May be the WB approved plan was the construction of a footbridge with escalators...but Jubilants made the "manual" staircase insptead and pocketed the change! Portfolio: Sold You know you've made it when you get a parking space for your yatcht.
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
Impunity wrote:hardwood wrote:washiku wrote:Impunity wrote:maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? You mean even WB wanaweza gongwa? The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga May be the WB approved plan was the construction of a footbridge with escalators...but Jubilants made the "manual" staircase insptead and pocketed the change! If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.
|
|
|
Rank: Veteran Joined: 11/11/2006 Posts: 972 Location: Home
|
hardwood wrote: If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.
Mboss weeee! The money is to be paid back by Wanjiku.
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
|
|
|
Rank: Veteran Joined: 1/3/2014 Posts: 1,063
|
holycow wrote:hardwood wrote: If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.
Mboss weeee! The money is to be paid back by Wanjiku. Hii hardwood ni ndongomothi tu. Consistency is better than intensity
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
|
|
|
Rank: Elder Joined: 5/21/2013 Posts: 2,841 Location: Here
|
maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m...  Life is like playing a violin solo in public and learning the instrument as one goes on.
|
|
|
Wazua
»
Club SK
»
Politics
»
#UhuruChallenge
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|