#UhuruChallenge
hardwood
#21 Posted : Tuesday, January 10, 2017 10:20:26 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


If the world bank used 600m to fund the bridge, then go ask them how and why? They know why it cost 600m.
washiku
#22 Posted : Tuesday, January 10, 2017 10:22:20 AM
Rank: Chief


Joined: 5/9/2007
Posts: 13,095
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?
maka
#23 Posted : Tuesday, January 10, 2017 10:26:39 AM
Rank: Elder


Joined: 4/22/2010
Posts: 11,522
Location: Nairobi
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


It wouldnt be the first time...
possunt quia posse videntur
hardwood
#24 Posted : Tuesday, January 10, 2017 10:26:58 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


Problem with kenyans including many hapa wazua is that they never use their brains. They just rely on rumours, including what bored housegirls are tweeting.
Much Know
#25 Posted : Tuesday, January 10, 2017 10:38:55 AM
Rank: Elder


Joined: 12/6/2008
Posts: 3,568
hardwood wrote:
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


Problem with kenyans including many hapa wazua is that they never use their brains. They just rely on rumours, including what bored housegirls are tweeting.

Laughing out loudly following teenage housegirls on twitter, or is it stalking, hawa watu wa odm saa zingine. Who has the time to cover a t.v with newspapers and tie slippers with strings and post for people to follow? Must be teenage housegirls as you say. Utoto ingine bwana!
Ras Kienyeji Man
hardwood
#26 Posted : Tuesday, January 10, 2017 10:41:37 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga
hardwood
#27 Posted : Tuesday, January 10, 2017 10:46:50 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
Much Know wrote:
hardwood wrote:
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


Problem with kenyans including many hapa wazua is that they never use their brains. They just rely on rumours, including what bored housegirls are tweeting.

Laughing out loudly following teenage housegirls on twitter, or is it stalking, hawa watu wa odm saa zingine. Who has the time to cover a t.v with newspapers and tie slippers with strings and post for people to follow? Must be teenage housegirls as you say. Utoto ingine bwana!


Very sad...


hardwood
#28 Posted : Tuesday, January 10, 2017 10:56:48 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
maka wrote:
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


It wouldnt be the first time...


Tell us more. It's is only baba who once tried to steal from the world bank and the consequences were quite severe. No one steals from the WB. WB #HawatakiUjinga.

https://www.standardmedi...-fire-over-missing-cash

Much Know
#29 Posted : Tuesday, January 10, 2017 11:04:00 AM
Rank: Elder


Joined: 12/6/2008
Posts: 3,568
hardwood wrote:
maka wrote:
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


It wouldnt be the first time...


Tell us more. It's is only baba who once tried to steal from the world bank and the consequences were quite severe. No one steals from the WB. WB #HawatakiUjinga.

https://www.standardmedi...-fire-over-missing-cash


IF i could have only gotten a grant of 500K for our company when they were hogging this billions with their relatives, we would have changed Kenya, at least moved many out of poverty, now some wazungus "strangers" are the ones helping us develop technology in Kenya, what Kenyan youth are using to develop technology in Kenya are purely donations and dont amount to more than 100 million! Imagine! The rest is eaten by "very clever" people like odm politicians and their close relatives, girlfriends and maids, just eaten! At Kempiski!
Ras Kienyeji Man
Impunity
#30 Posted : Tuesday, January 10, 2017 11:04:35 AM
Rank: Elder


Joined: 3/2/2009
Posts: 26,330
Location: Masada
hardwood wrote:
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga


May be the WB approved plan was the construction of a footbridge with escalators...but Jubilants made the "manual" staircase insptead and pocketed the change!

Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

hardwood
#31 Posted : Tuesday, January 10, 2017 11:20:34 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
Impunity wrote:
hardwood wrote:
washiku wrote:
Impunity wrote:
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...


The one at KU cost about 10M or was it the gate that cost 10M?



You mean even WB wanaweza gongwa?


The world bank has the audited book of accounts for this 600m project. Anyone interested to see the details can visit their offices. #HatutakiUjinga


May be the WB approved plan was the construction of a footbridge with escalators...but Jubilants made the "manual" staircase insptead and pocketed the change!



If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.
holycow
#32 Posted : Tuesday, January 10, 2017 11:30:44 AM
Rank: Veteran


Joined: 11/11/2006
Posts: 972
Location: Home
hardwood wrote:

If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.


Mboss weeee! The money is to be paid back by Wanjiku.
hardwood
#33 Posted : Tuesday, January 10, 2017 11:33:44 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
How come there were no tweets on this:

PeterReborn
#34 Posted : Tuesday, January 10, 2017 11:37:19 AM
Rank: Veteran


Joined: 1/3/2014
Posts: 1,063
holycow wrote:
hardwood wrote:

If the WB has not complained that their money was eaten, who are we to complain? When baba ate their money, they complained and demanded a refund, so if jubilee had eaten their money, they would have complained and cancelled the project, and demanded back their money.


Mboss weeee! The money is to be paid back by Wanjiku.

Hii hardwood ni ndongomothi tu.
Consistency is better than intensity
hardwood
#35 Posted : Tuesday, January 10, 2017 11:45:42 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
hardwood wrote:
How come there were no tweets on this:




or this...

Rankaz13
#36 Posted : Tuesday, January 10, 2017 12:45:44 PM
Rank: Elder


Joined: 5/21/2013
Posts: 2,841
Location: Here
maka wrote:
kiash wrote:
hardwood wrote:
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.



On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ?
Someone must be laughing all the way to the mattress.


In Kenya it costs 600m...



Life is like playing a violin solo in public and learning the instrument as one goes on.
Users browsing this topic
Guest (2)
2 Pages<12
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2025 Wazua.co.ke. All Rights Reserved.