Wazua
»
Club SK
»
Politics
»
#UhuruChallenge
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
|
|
|
Rank: Veteran Joined: 11/14/2006 Posts: 1,311
|
No wonder Twitter is dying.... Or they call it declining?
|
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
Hilarious, too funny! Business opportunities are like buses,there's always another one coming
|
|
|
Rank: User Joined: 8/15/2013 Posts: 13,237 Location: Vacuum
|
|
|
|
Rank: Elder Joined: 9/19/2015 Posts: 2,871 Location: hapo
|
I think we have a fetish with ribbons. Thieves are not good people. Tumeelewana?
|
|
|
Rank: User Joined: 8/15/2013 Posts: 13,237 Location: Vacuum
|
If Obiero did it, Who Am I?
|
|
|
Rank: User Joined: 8/15/2013 Posts: 13,237 Location: Vacuum
|
If Obiero did it, Who Am I?
|
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
Business opportunities are like buses,there's always another one coming
|
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
This is getting toooooooooooo funny! Business opportunities are like buses,there's always another one coming
|
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge.
|
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
|
|
|
Rank: User Joined: 8/15/2013 Posts: 13,237 Location: Vacuum
|
|
|
|
Rank: Chief Joined: 5/9/2007 Posts: 13,095
|
|
|
|
Rank: Elder Joined: 5/21/2013 Posts: 2,841 Location: Here
|
|
|
|
Rank: Elder Joined: 12/7/2012 Posts: 11,929
|
See no evil, hear no evil In the business world, everyone is paid in two coins - cash and experience. Take the experience first; the cash will come later - H Geneen
|
|
|
Rank: Member Joined: 8/25/2015 Posts: 839 Location: Kite
|
inaitwa synco something
|
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
Its become a global joke now... http://www.bbc.com/news/world-africa-38558916Business opportunities are like buses,there's always another one coming
|
|
|
Rank: Veteran Joined: 4/27/2010 Posts: 951 Location: Nyumbani
|
hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress.
|
|
|
Rank: Elder Joined: 4/22/2010 Posts: 11,522 Location: Nairobi
|
kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... possunt quia posse videntur
|
|
|
Rank: Elder Joined: 3/2/2009 Posts: 26,330 Location: Masada
|
maka wrote:kiash wrote:hardwood wrote:Why all the hullabaloo? A 600m project/ footbridge is significant by any standard especially considering the many pedestrian lives that will be saved by the bridge. On another note, did that footbridge really cost 600M ? Uhuru is walking on concrete from a concrete mixer, not even tiled. There was a footbridge @KU before Thika road was done cannot remember the cost but was far below 500M at the time. The they have been building some like at Ngara which is two way .But the road in Mombasa is one way so the length of the bridge is less than the Ngara one.Who has the figures for the footbridges done on Thika highway ? Someone must be laughing all the way to the mattress. In Kenya it costs 600m... The one at KU cost about 10M or was it the gate that cost 10M? Portfolio: Sold You know you've made it when you get a parking space for your yatcht.
|
|
|
Wazua
»
Club SK
»
Politics
»
#UhuruChallenge
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|