Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly

Some fellows here need help alongside Kuria. For a start, railways are elevated along animal corridor and they also get elevated on plains for engineering reasons. Assuming someone's proff lost his books at that aviation college and therefore, the welder did not conclude his syllabus, he may refer to the following physics lessons;

Tractive effort
Track curvature
Percentage grade
Tractive force required for acceleration.

I rest my lesson.


Nothing great was ever achieved without enthusiasm.
Obi 1 Kanobi
#242 Posted : Monday, June 13, 2016 3:08:56 PM
Rank: Elder


Joined: 7/23/2008
Posts: 3,017
Njung'e wrote:
Hahahahahaha.......Seriously, we have mega problems with our graduate engineers.

@njung'e

Personal battles with @impunity aside, why was the line elevated for 500Kms. Its a major cost added and there has to be a good reason.
"The purpose of bureaucracy is to compensate for incompetence and lack of discipline." James Collins
Njung'e
#243 Posted : Monday, June 13, 2016 3:17:12 PM
Rank: Elder


Joined: 2/7/2007
Posts: 11,935
Location: Nairobi
Obi 1 Kanobi wrote:
Njung'e wrote:
Hahahahahaha.......Seriously, we have mega problems with our graduate engineers.

@njung'e

Personal battles with @impunity aside, why was the line elevated for 500Kms. Its a major cost added and there has to be a good reason.


Sorry Obi. I have no problem with the welder. Just his ignorance. Animal corridors is one but the rest has to do with the fact that the train has to climb from sea level to heights above 6800 feet ASL. This must be done efficiently, at the design speeds and considering loads to be hauled. Same applies for a railway line going down hill (say from Londiani to Kisumu and i think this is one reason why SGR will pass through Bomet to Kisumu rather than through Nakuru). The rolling is moderated and this also informs sizing of engines for various levels of loads.
Nothing great was ever achieved without enthusiasm.
Obi 1 Kanobi
#244 Posted : Monday, June 13, 2016 3:26:47 PM
Rank: Elder


Joined: 7/23/2008
Posts: 3,017
Njung'e wrote:
Obi 1 Kanobi wrote:
Njung'e wrote:
Hahahahahaha.......Seriously, we have mega problems with our graduate engineers.

@njung'e

Personal battles with @impunity aside, why was the line elevated for 500Kms. Its a major cost added and there has to be a good reason.


Sorry Obi. I have no problem with the welder. Just his ignorance. Animal corridors is one but the rest has to do with the fact that the train has to climb from sea level to heights above 6800 feet ASL. This must be done efficiently, at the design speeds and considering loads to be hauled. Same applies for a railway line going down hill (say from Londiani to Kisumu and i think this is one reason why SGR will pass through Bomet to Kisumu rather than through Nakuru). The rolling is moderated and this also informs sizing of engines for various levels of loads.


Thanks for this, I bet they are going to dig the sh*t out of the escarpment before the train drops into the Rift Valley, or create a massive bridge to manage the altitude drop to the Rift floor, that will be interesting.
"The purpose of bureaucracy is to compensate for incompetence and lack of discipline." James Collins
Njung'e
#245 Posted : Monday, June 13, 2016 3:46:17 PM
Rank: Elder


Joined: 2/7/2007
Posts: 11,935
Location: Nairobi
Obi 1 Kanobi wrote:
[quote=Njung'e][quote=Obi 1 Kanobi][quote=Njung'e]

Thanks for this, I bet they are going to dig the sh*t out of the escarpment before the train drops into the Rift Valley, or create a massive bridge to manage the altitude drop to the Rift floor, that will be interesting.


Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly ....Okay!. You are really funny!. Back to business. There will be no long bridges to the floor of the RV. The easier and far much gentler route would still be using the inner length of the side of the escarpment just as in the current situation. James May offers a simplified explanation in the video below. I hope this helps.

http://tracks.lionel.com...-cant-trains-go-uphill/
Nothing great was ever achieved without enthusiasm.
Impunity
#246 Posted : Monday, June 13, 2016 4:19:46 PM
Rank: Elder


Joined: 3/2/2009
Posts: 26,328
Location: Masada
Njung'e wrote:
Obi 1 Kanobi wrote:
Njung'e wrote:
Hahahahahaha.......Seriously, we have mega problems with our graduate engineers.

@njung'e

Personal battles with @impunity aside, why was the line elevated for 500Kms. Its a major cost added and there has to be a good reason.


Sorry Obi. I have no problem with the welder. Just his ignorance. Animal corridors is one but the rest has to do with the fact that the train has to climb from sea level to heights above 6800 feet ASL. This must be done efficiently, at the design speeds and considering loads to be hauled. Same applies for a railway line going down hill (say from Londiani to Kisumu and i think this is one reason why SGR will pass through Bomet to Kisumu rather than through Nakuru). The rolling is moderated and this also informs sizing of engines for various levels of loads.


S.E.N.I.L.E.

Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

Swenani
#247 Posted : Monday, June 13, 2016 4:31:06 PM
Rank: User


Joined: 8/15/2013
Posts: 13,237
Location: Vacuum
Impunity wrote:
By the way the rail lines which are usually entiley elevated are the Bullet Lines...doing speeds in the order of 350km...why elevate a line which will struggle to maintain a meager 80km/h on a straight stretch?

Mark you the Lunatic Line, designed in 1890s can accomodate speeds of up to 72km/h on safe stretches.

These are the results you get when you put a @Maina to decide a railway matters...pesa tu, people who have never boarded a train in their life are the MDs of the same.

What do u expect?

Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly
If Obiero did it, Who Am I?
Swenani
#248 Posted : Monday, June 13, 2016 4:32:49 PM
Rank: User


Joined: 8/15/2013
Posts: 13,237
Location: Vacuum
Obi 1 Kanobi wrote:
Njung'e wrote:
Obi 1 Kanobi wrote:
Njung'e wrote:
Hahahahahaha.......Seriously, we have mega problems with our graduate engineers.

@njung'e

Personal battles with @impunity aside, why was the line elevated for 500Kms. Its a major cost added and there has to be a good reason.


Sorry Obi. I have no problem with the welder. Just his ignorance. Animal corridors is one but the rest has to do with the fact that the train has to climb from sea level to heights above 6800 feet ASL. This must be done efficiently, at the design speeds and considering loads to be hauled. Same applies for a railway line going down hill (say from Londiani to Kisumu and i think this is one reason why SGR will pass through Bomet to Kisumu rather than through Nakuru). The rolling is moderated and this also informs sizing of engines for various levels of loads.


Thanks for this, I bet they are going to dig the sh*t out of the escarpment before the train drops into the Rift Valley, or create a massive bridge to manage the altitude drop to the Rift floor, that will be interesting.


Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly
If Obiero did it, Who Am I?
Swenani
#249 Posted : Monday, June 13, 2016 4:51:43 PM
Rank: User


Joined: 8/15/2013
Posts: 13,237
Location: Vacuum
Njung'e wrote:
Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly

Some fellows here need help alongside Kuria. For a start, railways are elevated along animal corridor and they also get elevated on plains for engineering reasons. Assuming someone's proff lost his books at that aviation college and therefore, the welder did not conclude his syllabus, he may refer to the following physics lessons;

Tractive effort
Track curvature
Percentage grade
Tractive force required for acceleration.

I rest my lesson.




For the rest of us who didnt attend engineering or welding classes, I have tried to simplify the above lessons in a layman's language

1. Tractive effort-When you are landing and you feel like your landing gear is being held captive by the airpor(esp when she is having an orgasms), that'sthe tractive effort of the airport

2.Track curvature-Refer to teh photo of Edna Kariuki(the fisilet who caused the death of Muganda)

3.Percentage grade-The incline/decline of the airport relative to the landing position

4.Tractive force required for acceleration.-The force exerted by your landing gear in an airport

If Obiero did it, Who Am I?
murchr
#250 Posted : Monday, June 13, 2016 4:52:13 PM
Rank: Elder


Joined: 2/26/2012
Posts: 15,980
This forum will exposed so many of the so called "half baked" graduates
"There are only two emotions in the market, hope & fear. The problem is you hope when you should fear & fear when you should hope: - Jesse Livermore
.
Impunity
#251 Posted : Monday, June 13, 2016 4:53:13 PM
Rank: Elder


Joined: 3/2/2009
Posts: 26,328
Location: Masada
@Obi 1 Kanobi, I am still re-searching to find out why the entire length, 500km-plus was elevated, including the marshalling yards and the stations.
Let the senile and empty headed chief tribal bigot NOT derail(pun) your concern.

Some of the highest climb rails are found in Swistzeland, Chile and Peru...and nothing is elvated the Kenyan style. We must have been given the wrong design may be meant for other projects.

Those people who have travelled outside (and not only in Marsabit) will tell you that rails are elevated for high speed (350km/h plus), but even in sparsley populated areas like the Ukambani the thing just stay low and get fenced off to prevent wild animals and walevi.

Our SGR as currently being built can only achieve max speed of 120km/h, whether powered by DEU and Pure Electric!

This is a GOLD elephant, Lunatic squared!!!
Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

kayhara
#252 Posted : Monday, June 13, 2016 4:59:51 PM
Rank: Veteran


Joined: 5/5/2011
Posts: 1,059
Swenani wrote:
Impunity wrote:
By the way the rail lines which are usually entiley elevated are the Bullet Lines...doing speeds in the order of 350km...why elevate a line which will struggle to maintain a meager 80km/h on a straight stretch?

Mark you the Lunatic Line, designed in 1890s can accomodate speeds of up to 72km/h on safe stretches.

These are the results you get when you put a @Maina to decide a railway matters...pesa tu, people who have never boarded a train in their life are the MDs of the same.

What do u expect?

Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly

By the way come to think about it the MD of KR has maybe never used a train, but same way,the MD of Kenyatta has never been treated there etc.
To Each His Own
Impunity
#253 Posted : Monday, June 13, 2016 5:04:10 PM
Rank: Elder


Joined: 3/2/2009
Posts: 26,328
Location: Masada
Swenani wrote:
Njung'e wrote:
Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly

Some fellows here need help alongside Kuria. For a start, railways are elevated along animal corridor and they also get elevated on plains for engineering reasons. Assuming someone's proff lost his books at that aviation college and therefore, the welder did not conclude his syllabus, he may refer to the following physics lessons;

Tractive effort
Track curvature
Percentage grade
Tractive force required for acceleration.

I rest my lesson.




For the rest of us who didnt attend engineering or welding classes, I have tried to simplify the above lessons in a layman's language

1. Tractive effort-When you are landing and you feel like your landing gear is being held captive by the airpor(esp when she is having an orgasms), that'sthe tractive effort of the airport

2.Track curvature-Refer to teh photo of Edna Kariuki(the fisilet who caused the death of Muganda)

3.Percentage grade-The incline/decline of the airport relative to the landing position

4.Tractive force required for acceleration.-The force exerted by your landing gear in an airport




Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly
Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

Impunity
#254 Posted : Monday, June 13, 2016 5:16:34 PM
Rank: Elder


Joined: 3/2/2009
Posts: 26,328
Location: Masada
kayhara wrote:
Swenani wrote:
Impunity wrote:
By the way the rail lines which are usually entiley elevated are the Bullet Lines...doing speeds in the order of 350km...why elevate a line which will struggle to maintain a meager 80km/h on a straight stretch?

Mark you the Lunatic Line, designed in 1890s can accomodate speeds of up to 72km/h on safe stretches.

These are the results you get when you put a @Maina to decide a railway matters...pesa tu, people who have never boarded a train in their life are the MDs of the same.

What do u expect?


Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly


By the way come to think about it the MD of KR has maybe never used a train, but same way,the MD of Kenyatta has never been treated there etc.


And even that MD of RVR who was picked from some MED Supplier firm to come and manage railways...total blonde!!!

quote:
Quote:
The Kenya-Uganda railway concessionaire picked on Ex-General Electric general manager in charge of Health Care for East Africa, Isaiah Otieno Okoth to the Group as CEO.
.

How can such a person run a railway?
Pure Lunatics at the helm.

Probably the only thing him and that @Maina guy at KR knows about trains is the Dandora commuter junk, and they also see it on TV just like many dumb Kenyans do.

They know not that between 60s and mid 80s, Kenya and ZIM had the best run Railway in Africa,South of Sahara and North of Limpopo.

They dont know you could board a Lunatic express from Nairobi to Mombasa, have 3 course dinner, drink in a pub-on-rail, sleep for 8 hours on white linen, sh*t on western style loos, make babies while a board a Kenya train.

Total Blondes running the railway in Kenya, plus an *sshole government to boot.

Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

murchr
#255 Posted : Monday, June 13, 2016 5:22:20 PM
Rank: Elder


Joined: 2/26/2012
Posts: 15,980
Did the building of the reli transfer to Kenyans? I thought CRBC was in charge of design and engineering?
"There are only two emotions in the market, hope & fear. The problem is you hope when you should fear & fear when you should hope: - Jesse Livermore
.
Impunity
#256 Posted : Monday, June 13, 2016 5:46:09 PM
Rank: Elder


Joined: 3/2/2009
Posts: 26,328
Location: Masada
murchr wrote:
Did the building of the reli transfer to Kenyans? I thought CRBC was in charge of design and engineering?


We were told that they did the design, did the engineering, supplied most of the raw material and now they will manage and run it for at lest 5 years.
Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

nakujua
#257 Posted : Monday, June 13, 2016 5:46:13 PM
Rank: Elder


Joined: 12/17/2009
Posts: 3,583
Location: Kenya
Impunity wrote:
kayhara wrote:
Swenani wrote:
Impunity wrote:
By the way the rail lines which are usually entiley elevated are the Bullet Lines...doing speeds in the order of 350km...why elevate a line which will struggle to maintain a meager 80km/h on a straight stretch?

Mark you the Lunatic Line, designed in 1890s can accomodate speeds of up to 72km/h on safe stretches.

These are the results you get when you put a @Maina to decide a railway matters...pesa tu, people who have never boarded a train in their life are the MDs of the same.

What do u expect?


Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly


By the way come to think about it the MD of KR has maybe never used a train, but same way,the MD of Kenyatta has never been treated there etc.


And even that MD of RVR who was picked from some MED Supplier firm to come and manage railways...total blonde!!!

quote:
Quote:
The Kenya-Uganda railway concessionaire picked on Ex-General Electric general manager in charge of Health Care for East Africa, Isaiah Otieno Okoth to the Group as CEO.
.

How can such a person run a railway?
Pure Lunatics at the helm.

Probably the only thing him and that @Maina guy at KR knows about trains is the Dandora commuter junk, and they also see it on TV just like many dumb Kenyans do.

They know not that between 60s and mid 80s, Kenya and ZIM had the best run Railway in Africa,South of Sahara and North of Limpopo.

They dont know you could board a Lunatic express from Nairobi to Mombasa, have 3 course dinner, drink in a pub-on-rail, sleep for 8 hours on white linen, sh*t on western style loos, make babies while a board a Kenya train.

Total Blondes running the railway in Kenya, plus an *sshole government to boot.


Mr. Okoth has a good cv, with an engineering background from Germany - at least I know him and hopefully he will do a good job. No need to bad mouth him before the project is even finished - lets wait and see how beneficial it will be - only time will tell.
murchr
#258 Posted : Monday, June 13, 2016 5:54:16 PM
Rank: Elder


Joined: 2/26/2012
Posts: 15,980
Impunity wrote:
murchr wrote:
Did the building of the reli transfer to Kenyans? I thought CRBC was in charge of design and engineering?


We were told that they did the design, did the engineering, supplied most of the raw material and now they will manage and run it for at lest 5 years.


So why all the bile on Maina and Otieno Okoth? Did you apply for their positions and missed out?
"There are only two emotions in the market, hope & fear. The problem is you hope when you should fear & fear when you should hope: - Jesse Livermore
.
Njung'e
#259 Posted : Monday, June 13, 2016 5:58:08 PM
Rank: Elder


Joined: 2/7/2007
Posts: 11,935
Location: Nairobi
Impunity wrote:
@Obi 1 Kanobi, I am still re-searching to find out why the entire length,


Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly ....Still re-searching??Laughing out loudly Laughing out loudly Laughing out loudly Laughing out loudly ..I thought you knew the reasons when you called me SENILELaughing out loudly Laughing out loudly Laughing out loudly ...anyway......Go back for fee refund you dumbasssmile smile ?
Nothing great was ever achieved without enthusiasm.
Njung'e
#260 Posted : Monday, June 13, 2016 6:04:09 PM
Rank: Elder


Joined: 2/7/2007
Posts: 11,935
Location: Nairobi
murchr wrote:
This forum will exposed so many of the so called "half baked" graduates



This one is still in dough form.smile and it won't stop displaying more ignorance



Nothing great was ever achieved without enthusiasm.
Users browsing this topic
Guest (4)
70 Pages«<1112131415>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.