wazua Sat, Nov 30, 2024
Welcome Guest Search | Active Topics | Log In | Register

18 Pages«<34567>»
Low End Housing: High Risk, High Return
popat
#81 Posted : Sunday, February 14, 2016 1:12:53 AM
Rank: Member


Joined: 12/2/2009
Posts: 299
Location: kenya
enyands wrote:
Chaka wrote:
[quote=obiero]Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project


Tutalala leo kweli

Serious people don't sleep.Wewe endelea Kung'orota.
obiero
#82 Posted : Sunday, February 14, 2016 6:12:24 AM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
Chaka
#83 Posted : Sunday, February 14, 2016 11:13:10 AM
Rank: Elder


Joined: 2/16/2007
Posts: 2,114
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?
obiero
#84 Posted : Sunday, February 14, 2016 12:52:32 PM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
sparkly
#85 Posted : Sunday, February 14, 2016 6:28:08 PM
Rank: Elder


Joined: 9/23/2009
Posts: 8,083
Location: Enk are Nyirobi
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap
Life is short. Live passionately.
obiero
#86 Posted : Sunday, February 14, 2016 7:52:00 PM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
enyands
#87 Posted : Sunday, February 14, 2016 9:15:05 PM
Rank: Elder


Joined: 12/25/2014
Posts: 2,300
Location: kenya
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city


It's in kisii .
obiero
#88 Posted : Sunday, April 03, 2016 9:14:29 AM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
enyands wrote:
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city


It's in kisii .

Seems the trend is global, USA, South Africa, Kenya..
www.floridarealtors.org/...ts/article.cfm?id=329956
www.esor.co.za/low-cost-...projects-are-flying-high
www.nairobibusinessmonth...the-way-to-high-returns/

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
jerry
#89 Posted : Sunday, April 03, 2016 1:04:14 PM
Rank: Elder


Joined: 9/29/2006
Posts: 2,570
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani!
The opposite of courage is not cowardice, it's conformity.
The Great
#90 Posted : Sunday, April 03, 2016 4:19:15 PM
Rank: Member


Joined: 9/9/2015
Posts: 233
@jerry if you are wrong admit it and move on. Digging into others to divert attention is not the character of billionaires and you have got to be to have.
"Buy when there's blood in the streets, even if the blood is your own."
jerry
#91 Posted : Sunday, April 03, 2016 5:38:35 PM
Rank: Elder


Joined: 9/29/2006
Posts: 2,570
The Great wrote:
@jerry if you are wrong admit it and move on. Digging into others to divert attention is not the character of billionaires and you have got to be to have.

What I meant is that 5,950/= is not enough to charter whatever aircraft from Nairobi to Kisii.
The opposite of courage is not cowardice, it's conformity.
mkenyan
#92 Posted : Monday, April 04, 2016 10:13:42 AM
Rank: Veteran


Joined: 4/1/2009
Posts: 1,883
jerry wrote:
The Great wrote:
@jerry if you are wrong admit it and move on. Digging into others to divert attention is not the character of billionaires and you have got to be to have.

What I meant is that 5,950/= is not enough to charter whatever aircraft from Nairobi to Kisii.

the great is right. you were wrong. just admit it and move on. obiero said it was a chartered flight. he did not say he chartered it.
obiero
#93 Posted : Monday, April 11, 2016 7:09:45 PM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
jerry wrote:
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani!

Steps in building a low cost storied building as per own experience..
1. Draw up architectural and structural plans
2. Develop bills of quantity
3. Seek ministry of health approval at county level
4. Seek physical planning approval at county level
5. Publish change of user notice on property (if needed)
6. Town planner approval
7. Conduct environment impact assesment
8. Present EIA to NEMA for approval
9. Seek NCA certification
Anyone with a different scenario??

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
Boris Boyka
#94 Posted : Monday, April 11, 2016 10:26:59 PM
Rank: Veteran


Joined: 11/15/2013
Posts: 1,977
Location: Here
obiero wrote:
jerry wrote:
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani!

Steps in building a low cost storied building as per own experience..
1. Draw up architectural and structural plans
2. Develop bills of quantity
3. Seek ministry of health approval at county level
4. Seek physical planning approval at county level
5. Publish change of user notice on property (if needed)
6. Town planner approval
7. Conduct environment impact assesment
8. Present EIA to NEMA for approval
9. Seek NCA certification
Anyone with a different scenario??

Soil the hands of Nos 3-9 smile
Everybody STEALS, a THIEF is one who's CAUGHT stealing something of LITTLE VALUE. !!!
obiero
#95 Posted : Tuesday, April 12, 2016 1:46:10 AM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
Boris Boyka wrote:
obiero wrote:
jerry wrote:
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani!

Steps in building a low cost storied building as per own experience..
1. Draw up architectural and structural plans
2. Develop bills of quantity
3. Seek ministry of health approval at county level
4. Seek physical planning approval at county level
5. Publish change of user notice on property (if needed)
6. Town planner approval
7. Conduct environment impact assesment
8. Present EIA to NEMA for approval
9. Seek NCA certification
Anyone with a different scenario??

Soil the hands of Nos 3-9 smile

Sadly. The physical planner asked for 2k. That was the only hitch. Even recorded the convo. Promised myself that I would not use more than 5k total as 'facilitation' fee across all stages

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
UpcomingPaperChaser
#96 Posted : Tuesday, April 12, 2016 3:00:18 PM
Rank: Member


Joined: 1/20/2015
Posts: 489
Location: Nairobi
obiero wrote:
Boris Boyka wrote:
obiero wrote:
jerry wrote:
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani!

Steps in building a low cost storied building as per own experience..
1. Draw up architectural and structural plans
2. Develop bills of quantity
3. Seek ministry of health approval at county level
4. Seek physical planning approval at county level
5. Publish change of user notice on property (if needed)
6. Town planner approval
7. Conduct environment impact assesment
8. Present EIA to NEMA for approval
9. Seek NCA certification
Anyone with a different scenario??

Soil the hands of Nos 3-9 smile

Sadly. The physical planner asked for 2k. That was the only hitch. Even recorded the convo. Promised myself that I would not use more than 5k total as 'facilitation' fee across all stages


Boss, after you told us there is a 5k charter flight to a rural establishment in the land of night runners, i have been searching for the entire week, where i can charter a plane to eldoret and back for even 10 times that price..........weka mbisha hapa ndio tuamini ulipanda ndege
Enjoy every moment of your life, you never know when your time will come.
obiero
#97 Posted : Wednesday, April 13, 2016 8:48:09 AM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
UpcomingPaperChaser wrote:
obiero wrote:
Boris Boyka wrote:
obiero wrote:
jerry wrote:
obiero wrote:
sparkly wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Chaka wrote:
obiero wrote:
Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project

@obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft?

lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax


Ok,would you mind giving me the contacts of that charter Co.?

020-6006313 Yellow Wings


Charter ya elfu sita? lol even a cab wouldn't be that cheap

lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city

If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani!

Steps in building a low cost storied building as per own experience..
1. Draw up architectural and structural plans
2. Develop bills of quantity
3. Seek ministry of health approval at county level
4. Seek physical planning approval at county level
5. Publish change of user notice on property (if needed)
6. Town planner approval
7. Conduct environment impact assesment
8. Present EIA to NEMA for approval
9. Seek NCA certification
Anyone with a different scenario??

Soil the hands of Nos 3-9 smile

Sadly. The physical planner asked for 2k. That was the only hitch. Even recorded the convo. Promised myself that I would not use more than 5k total as 'facilitation' fee across all stages


Boss, after you told us there is a 5k charter flight to a rural establishment in the land of night runners, i have been searching for the entire week, where i can charter a plane to eldoret and back for even 10 times that price..........weka mbisha hapa ndio tuamini ulipanda ndege

Haha. Hi ndege imewasha watu

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
instinct
#98 Posted : Wednesday, April 13, 2016 10:45:07 PM
Rank: Member


Joined: 8/17/2007
Posts: 294
has the construction started?
hardwood
#99 Posted : Thursday, April 14, 2016 12:13:49 AM
Rank: Elder


Joined: 7/28/2015
Posts: 9,562
Location: Rodi Kopany, Homa Bay
instinct wrote:
has the construction started?


#cytonn
obiero
#100 Posted : Thursday, April 14, 2016 1:56:15 AM
Rank: Elder


Joined: 6/23/2009
Posts: 13,503
Location: nairobi
hardwood wrote:
instinct wrote:
has the construction started?


#cytonn

Not yet. Only excavation.. Going up to 5metre deep in some sections. But I have received all approvals including PP2 for change of user. Construction should start in 2 weeks

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
Users browsing this topic
Guest (3)
18 Pages«<34567>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.