Rental units on a 50 by 100 feet plot: 1 Bedroomed vs 2 Bedroomed.
a4architect.com
#1 Posted : Monday, January 25, 2010 11:44:52 AM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi

In areas that have a very high young population, such as areas near Universities - around Juja[JKUAT University] , Lower Kabete[University of Nairobi-Lower Kabete Campus], or Kahawa[Kenyatta University],1 bedroomed units will have a very high demand due to the large influx of parallel degree students. These are also in high demand near major towns and tourist locations such as Mombasa whereby holidaying tenants can rent for a short period of time.

Comparison on Rent.

In a 50 by 100 plot, you can put up to 7 No. I bedroomed units per floor for 5 floors=35 units.
At a modest rental income of minimum KES 8,000 per month this brings the amount to 8,000 x 35=KES 280,000.
The same area can contain 4 units of 2 bedroomed each x 5 floors =20 units.
At an average rent of minimum 12 k per month this brings the total to 12,000x 20 =240,000 per month.
These rental incomes are on the lower side-it you put quality finishes, the rents can double.

Comparison on cost of Construction.

With high quality finishes, the construction cost also increases significantly.

Read more on http://www.a4architect.c...edroomed-vs-2-bedroomed/
As Iron Sharpens Iron, So one Man Sharpens Another.
selah
#2 Posted : Monday, January 25, 2010 12:33:02 PM
Rank: Elder


Joined: 10/13/2009
Posts: 1,950
Location: in kenya
students rent houses to cut hostel costs now if you rent ahouse for 8,000/= and most hostel charge around 5,000/= unless you are targeting campus staff or some rich students it will be hard to sell given that they will have to buy food and other amenities.
'......to the acknowledgment of the mystery of God, and of the Father, and of Christ; 3 In whom are hid all the treasures of wisdom and knowledge.' Colossians 2:2-3
Phaoro
#3 Posted : Monday, January 25, 2010 4:14:42 PM
Rank: Member


Joined: 10/6/2009
Posts: 164
@ a4architect.com

What is the cost for an architectural plan for such a building?
a4architect.com
#4 Posted : Monday, January 25, 2010 5:50:13 PM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi
For design and construction supervision and management, it costs 6% of the estimated construction cost as per CAP 525 of the laws of Kenya
As Iron Sharpens Iron, So one Man Sharpens Another.
Phaoro
#5 Posted : Monday, January 25, 2010 6:29:10 PM
Rank: Member


Joined: 10/6/2009
Posts: 164
@ a4architect.com

What about the cost for design only? Maybe have a design in place and then work towards getting adequate resources.

Thanks for the information, i did not know about the CAP 525 law on construction. For someone planning to have a plan and do the foundation and the first two floors, it sounds unrealistic charging as a percentage of the total cost? is there a flat fee or a workable plan for such a scenario?



a4architect.com
#6 Posted : Monday, January 25, 2010 8:00:56 PM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi
The fees are broken down in several stages. Check out www.a4architect.com on the online consulting page for a copy of CAP 525 showing the fee breakdown
As Iron Sharpens Iron, So one Man Sharpens Another.
gathinga
#7 Posted : Tuesday, January 26, 2010 5:17:21 AM
Rank: Veteran


Joined: 11/30/2006
Posts: 635
@a4architect. You are a professional. many of us are interested in finsing out what the fees are. why not just quote. Even lawyers fees are guided by some statute but thats only a guide (cap if may), every advocate decides on their own pricing strategy based on the target clientele.pls answer how much you would accept for plans alone
a4architect.com
#8 Posted : Tuesday, January 26, 2010 6:20:10 AM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi
go to this site and scroll to the bottom and you will see the attached CAP 525 pages.
http://www.a4architect.c...itectural-consultation/


Also see the schedule below:Part A has 3 Stages.Part B has 8 stages.
You can choose any stage of service that you wish.For design only, that is Part A-stage 1 and 2 =10% +5% +10%=25% of total design fees. Design fees are 6% of the total cost. 25% of design fee is the same as 1.5% of the total construction estimate.

Stage Percentage of Total Fee
1. Outline proposals 10%
2. Scheme design
• Presentation to Client 5%
• Presentation to Design Team 10%
3. Production drawings and specifications 25 %
Total 50%


B. Part II Schedule of Payments after site operations (50% of fee)

Stage Percentage of Total Fee
1. Excavations to ground slab 10%
2. Walling to ring beam 10%
3. Roofing 10%
4. Door frames, windows and plastering 5%
5. Completion of interior finishes 5%
6. Completion of external finishes 5%
7. Defects liability period 2.5%
8. Completion certificate and handover 2.5%
Total 50%
As Iron Sharpens Iron, So one Man Sharpens Another.
a4architect.com
#9 Posted : Tuesday, January 26, 2010 6:23:19 AM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi
for the design alone, this brings it to 1.5% [Part A -Stage 1 and 2] of the total estimated cost of construction.
As Iron Sharpens Iron, So one Man Sharpens Another.
gathinga
#10 Posted : Tuesday, January 26, 2010 7:05:11 AM
Rank: Veteran


Joined: 11/30/2006
Posts: 635
that sounds reasonable....
Phaoro
#11 Posted : Tuesday, January 26, 2010 5:39:30 PM
Rank: Member


Joined: 10/6/2009
Posts: 164
@ Architect

It seems architects are costly, but I would also think with a good architect the customer alleviates headaches arising from "trial and error" type construction foremen. Thanks for the feedback.
Trump
#12 Posted : Wednesday, January 27, 2010 3:05:12 PM
Rank: Member


Joined: 10/19/2006
Posts: 66
@ architect

interesting insights.
Just do it!
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.