wazua Sat, Nov 23, 2024
Welcome Guest Search | Active Topics | Log In | Register

4 Pages«<234
Building a house with Prefabricated concrete Wall Panels - very cost effective
a4architect.com
#61 Posted : Thursday, October 16, 2014 6:08:56 PM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@jkmwatha, kenya happens to be lucky to have underground rock suitable to be cut into building stones. Most parts of the world, inluding most of africa, dont have this hence they have to rely on fired clay bricks and prefabs for housing. Once the stone quarries dry out in the next 5 years, there will be very many new methods of constructing such as prefabs, bricks , earthbags etc. Cost of prefab walling can go down once we research into nower methods of reducing costs eg the wire mesh in the prefab can be replaced with polypropylene fishing net for the same effect...after lengthy research ofcourse to check if this is possible .. Once we invest in research, then there are hopes of bringing down these costs.
As Iron Sharpens Iron, So one Man Sharpens Another.
Kratos
#62 Posted : Thursday, October 16, 2014 8:38:07 PM
Rank: Veteran


Joined: 9/19/2011
Posts: 1,694
a4architect.com wrote:
@jkmwatha, kenya happens to be lucky to have underground rock suitable to be cut into building stones. Most parts of the world, inluding most of africa, dont have this hence they have to rely on fired clay bricks and prefabs for housing. Once the stone quarries dry out in the next 5 years, there will be very many new methods of constructing such as prefabs, bricks , earthbags etc. Cost of prefab walling can go down once we research into nower methods of reducing costs eg the wire mesh in the prefab can be replaced with polypropylene fishing net for the same effect...after lengthy research ofcourse to check if this is possible .. Once we invest in research, then there are hopes of bringing down these costs.


How exactly was this determined?

“People will believe a big lie sooner than a little one, and if you repeat it frequently enough, people will sooner or later believe it.” ― Walter C. Langer
a4architect.com
#63 Posted : Friday, October 17, 2014 9:30:54 AM
Rank: Veteran


Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@kratos, thats my estimation, based on the scarcity of quarries at the moment. Kilifi quarry is already nearly finished, with the operators moving to Juja. Juja quarries are also nearly finished. Currently, to get a good quarry mine in Juja is not easy plus the costs are too high due to the scarcity. A good guestimation for the stones to finish is around 5 years but could take less or more.
As Iron Sharpens Iron, So one Man Sharpens Another.
gk
#64 Posted : Thursday, June 04, 2015 10:54:25 AM
Rank: Member


Joined: 5/17/2008
Posts: 488
The Kitengela Chinese are selling a panel of 1.2*2.8 at 5400/- and sounds quite expensive.
Does anyone know of better prices elsewhere?
Jitahidi
#65 Posted : Thursday, June 04, 2015 12:04:52 PM
Rank: Member


Joined: 5/8/2008
Posts: 288
a4architect.com wrote:
@kratos, thats my estimation, based on the scarcity of quarries at the moment. Kilifi quarry is already nearly finished, with the operators moving to Juja. Juja quarries are also nearly finished. Currently, to get a good quarry mine in Juja is not easy plus the costs are too high due to the scarcity. A good guestimation for the stones to finish is around 5 years but could take less or more.

I totally agree might be the reasons why stone prices are going up every month in Juja. Also most quarries are now relocating from Juja to BAT area along Thika - Garissa rd in search for quarry mines
Bachuma Gate
#66 Posted : Thursday, June 04, 2015 12:09:56 PM
Rank: Member


Joined: 3/26/2012
Posts: 280
gk wrote:
The Kitengela Chinese are selling a panel of 1.2*2.8 at 5400/- and sounds quite expensive.
Does anyone know of better prices elsewhere?

Try hongkong ceramics plaza 2000 msa rd.
DOH
bennry
#67 Posted : Friday, May 04, 2018 10:28:41 AM
Rank: New-farer


Joined: 8/12/2016
Posts: 22
I called Nhc recently and was tol that a 3m by 1.2m wall panel goes for about ksh 5,750/=. The slab panel of the same size goes for 6,570.
I asked a Qs friend about the panels and he told that they would only be cost effective if you are bulding something thats bigger/large scale. probably over 1000sqm.
obiero
#68 Posted : Friday, May 04, 2018 10:47:39 AM
Rank: Elder


Joined: 6/23/2009
Posts: 13,499
Location: nairobi
bennry wrote:
I called Nhc recently and was tol that a 3m by 1.2m wall panel goes for about ksh 5,750/=. The slab panel of the same size goes for 6,570.
I asked a Qs friend about the panels and he told that they would only be cost effective if you are bulding something thats bigger/large scale. probably over 1000sqm.

1000sqm ni mini-warehouse

HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
Swenani
#69 Posted : Friday, May 04, 2018 11:05:19 AM
Rank: User


Joined: 8/15/2013
Posts: 13,236
Location: Vacuum
obiero wrote:
bennry wrote:
I called Nhc recently and was tol that a 3m by 1.2m wall panel goes for about ksh 5,750/=. The slab panel of the same size goes for 6,570.
I asked a Qs friend about the panels and he told that they would only be cost effective if you are bulding something thats bigger/large scale. probably over 1000sqm.

1000sqm ni mini-warehouse


what if it's a 4 storey building with 250sqm per floor?
If Obiero did it, Who Am I?
Mukiri
#70 Posted : Monday, July 30, 2018 12:49:56 PM
Rank: Elder


Joined: 7/11/2012
Posts: 5,222
Swenani wrote:
obiero wrote:
bennry wrote:
I called Nhc recently and was tol that a 3m by 1.2m wall panel goes for about ksh 5,750/=. The slab panel of the same size goes for 6,570.
I asked a Qs friend about the panels and he told that they would only be cost effective if you are bulding something thats bigger/large scale. probably over 1000sqm.

1000sqm ni mini-warehouse


what if it's a 4 storey building with 250sqm per floor?

Did you ever get your answer?

If the panels prove too expensive, I'm toying with the idea of getting Geoplast formwork and concreting in-situ

Proverbs 19:21
shanoka
#71 Posted : Tuesday, January 22, 2019 7:27:37 AM
Rank: New-farer


Joined: 8/21/2017
Posts: 33
Mukiri wrote:
Swenani wrote:
obiero wrote:
bennry wrote:
I called Nhc recently and was tol that a 3m by 1.2m wall panel goes for about ksh 5,750/=. The slab panel of the same size goes for 6,570.
I asked a Qs friend about the panels and he told that they would only be cost effective if you are bulding something thats bigger/large scale. probably over 1000sqm.

1000sqm ni mini-warehouse


what if it's a 4 storey building with 250sqm per floor?

Did you ever get your answer?

If the panels prove too expensive, I'm toying with the idea of getting Geoplast formwork and concreting in-situ



How did this turn out for you?
gk
#72 Posted : Friday, February 01, 2019 1:14:58 PM
Rank: Member


Joined: 5/17/2008
Posts: 488
shanoka wrote:
Mukiri wrote:
Swenani wrote:
obiero wrote:
bennry wrote:
I called Nhc recently and was tol that a 3m by 1.2m wall panel goes for about ksh 5,750/=. The slab panel of the same size goes for 6,570.
I asked a Qs friend about the panels and he told that they would only be cost effective if you are bulding something thats bigger/large scale. probably over 1000sqm.

1000sqm ni mini-warehouse


what if it's a 4 storey building with 250sqm per floor?

Did you ever get your answer?

If the panels prove too expensive, I'm toying with the idea of getting Geoplast formwork and concreting in-situ



How did this turn out for you?


How about hollow interlocking blocks for the walls.
Users browsing this topic
Guest (6)
4 Pages«<234
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.