Outering Road Finally....
Rank: Member Joined: 6/25/2009 Posts: 41
|
http://www.standardmedia...e-told-to-move?pageNo=1
Interesting I hope the word and lives of "us folks change for best". Completed on time and done to order. Please dont forget drainage services that may however turn to be dumping conduits.....
|
|
Rank: Member Joined: 6/25/2009 Posts: 41
|
http://www.standardmedia...e-told-to-move?pageNo=1
Interesting I hope the word and lives of "us folks change for best". Completed on time and done to order. Please dont forget drainage services that may however turn to be dumping conduits.....
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
If Upper Hill is anything to go by, don't expect a road until 2020. Business opportunities are like buses,there's always another one coming
|
|
Rank: Member Joined: 1/25/2010 Posts: 344
|
|
|
Rank: Elder Joined: 3/2/2007 Posts: 8,776 Location: Cameroon
|
|
|
Rank: Elder Joined: 3/2/2007 Posts: 8,776 Location: Cameroon
|
Deviation roads, of about 12km, will be upgraded for use and they include Thika Superhighway, Mathare North, Juja road, Mtarakwa, Komarock Road, Embakasi Barracks, Kangundo Road, Eastern Bypass and Outer Ring Road. Seems a few other roads will benefit too....to be used as diversions. Kwanza that terrible section from kimarock/kayole thru the garrison to the bypass......its a nice escape route from traffic of course, if done well. TULIA.........UFUNZWE!
|
|
Rank: Elder Joined: 3/2/2009 Posts: 26,328 Location: Masada
|
simonkabz wrote:Deviation roads, of about 12km, will be upgraded for use and they include Thika Superhighway, Mathare North, Juja road, Mtarakwa, Komarock Road, Embakasi Barracks, Kangundo Road, Eastern Bypass and Outer Ring Road.
Seems a few other roads will benefit too....to be used as diversions. Kwanza that terrible section from kimarock/kayole thru the garrison to the bypass......its a nice escape route from traffic of course, if done well. Portfolio: Sold You know you've made it when you get a parking space for your yatcht.
|
|
Rank: Veteran Joined: 10/9/2006 Posts: 1,502
|
Seems suspects maintaining Kibaki infrastructure momentum. work to prosper
|
|
Rank: Elder Joined: 10/23/2008 Posts: 3,966
|
Check this link on Outering Road Simulation. Luck is when Preparation meets Opportunity. ~ Lucius Annaeus Seneca
|
|
Rank: Member Joined: 6/14/2010 Posts: 521 Location: Nairobi
|
This is beautiful. It appears to be as complex as Thika SuperHighway.
|
|
Rank: Veteran Joined: 7/5/2010 Posts: 2,061 Location: Nairobi
|
The optimist wrote: This is beautiful. It appears to be as complex as Thika SuperHighway. Good stuff, small flaws ...there are T-junctions at the Kayole spine and Baba dogo ...in need of slip roads or an overpass. If they correct this then it would be perfect. Better just to do the whole thing right, right?
|
|
Rank: Elder Joined: 3/2/2007 Posts: 8,776 Location: Cameroon
|
Youtube version http://softkenya.com/vid...k-after-its-completion/
It will be excellent once done. . TULIA.........UFUNZWE!
|
|
Rank: Elder Joined: 3/2/2007 Posts: 8,776 Location: Cameroon
|
Impunity wrote:simonkabz wrote:Deviation roads, of about 12km, will be upgraded for use and they include Thika Superhighway, Mathare North, Juja road, Mtarakwa, Komarock Road, Embakasi Barracks, Kangundo Road, Eastern Bypass and Outer Ring Road.
Seems a few other roads will benefit too....to be used as diversions. Kwanza that terrible section from kimarock/kayole thru the garrison to the bypass......its a nice escape route from traffic of course, if done well. Ni kukata shortcut ya rusungu miingi. TULIA.........UFUNZWE!
|
|
Rank: Elder Joined: 3/2/2007 Posts: 8,776 Location: Cameroon
|
Well, April came and went. June is here....nothing, is there? Sasa nasikia October. I want to believe snails move faster! KulaRaha wrote:If Upper Hill is anything to go by, don't expect a road until 2020. TULIA.........UFUNZWE!
|
|
Rank: Elder Joined: 3/2/2007 Posts: 8,776 Location: Cameroon
|
Quote:Ministry of Transport and Infrastructure-GoK New licence plates & driving licences are expected to be rolled out in phases over the course of the year. The Outer Ring expansion project will start in October,and we expect to be complete in 3 years. #SGR is on course,and the contractors committed to having it ready by Dec 2017. As for the Dongo-Kundu project,it will be done in 3 phases. An advert for the construction of the 1st phase will be out soon TULIA.........UFUNZWE!
|
|
Rank: Elder Joined: 7/26/2007 Posts: 6,514
|
simonkabz wrote:Well, April came and went. June is here....nothing, is there? Sasa nasikia October. I want to believe snails move faster! KulaRaha wrote:If Upper Hill is anything to go by, don't expect a road until 2020. They're still probably negotiating who eats what where how how much. Business opportunities are like buses,there's always another one coming
|
|
Rank: User Joined: 8/15/2013 Posts: 13,237 Location: Vacuum
|
KulaRaha wrote:simonkabz wrote:Well, April came and went. June is here....nothing, is there? Sasa nasikia October. I want to believe snails move faster! KulaRaha wrote:If Upper Hill is anything to go by, don't expect a road until 2020. They're still probably negotiating who eats what where how how much. Sis watu wa Eastlands hatulipi tax;Outering road is a shamba If Obiero did it, Who Am I?
|
|
Rank: Elder Joined: 10/23/2009 Posts: 2,375
|
simonkabz wrote:Well, April came and went. June is here....nothing, is there? Sasa nasikia October. I want to believe snails move faster! KulaRaha wrote:If Upper Hill is anything to go by, don't expect a road until 2020. These GOK things are usually like this. This was the same story with the very important Mwatate -Taveta Road. It was said PORK was coming to commission it in April,then May and both these passed. Finally it has been confirmed that he will be coming to do it on June 18/19. If completed the road may in a small way ease the pressure on the Mombasa-Nairobi highway. It is better to keep your mouth closed and let people think you are a fool than to open it and remove all doubt... -Mark Twain
|
|
Rank: Member Joined: 7/6/2010 Posts: 242
|
They have also being saying nice things about doing away with the 2 roundabouts at Nyayo stadium but nothing concrete on the ground except continuous beautification. When the government says in the next 3 months it actually means next 1 year or 2 years.
|
|
Rank: Member Joined: 8/7/2010 Posts: 728 Location: Wazuaville
|
josimar wrote:They have also being saying nice things about doing away with the 2 roundabouts at Nyayo stadium but nothing concrete on the ground except continuous beautification. When the government says in the next 3 months it actually means next 1 year or 2 years.
hahah I remember the floating highway that was to fly above uhuru highway. juzi i was stuck in traffic hapo Intercon and remembered hio viosion twedy fote "Money never sleeps"
|
|
Wazua
»
Market
»
Review
»
Outering Road Finally....
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|