4 bedroom house construction
luttz
#1 Posted : Friday, December 26, 2008 1:02:00 PM
Rank: Member


Joined: 3/18/2008
Posts: 377
Hi Skerians,

I am in the design process for 4 bedroom (approxmately 3600 sq ft) townhouse standing on half acre of land in Garden estate. The land has black cotton soil. I intend top start construction in the second quarter of 2009,where I will source for suitable contractor to oversee the assignment. I am considering buying all materials with the contractor providing labour and supervision of entire process. If i found suitable contractor I can outsource the entire process. I would like to get estimates of the total contruction cost although my tentative budget is 5m + or minus 10%. Please share any experiences,and also provide references of QS and contractors.



Happy New year and God bless SK community


"You've never lived until you've almost died; for those who have fought for it, life has a flavour the protected will never know."
kirgit
#2 Posted : Monday, December 29, 2008 4:44:00 AM
Rank: Member


Joined: 2/27/2008
Posts: 4
Luttz,for that size of house you will need abt 7m. Better get back to the drawing board.
Theu
#3 Posted : Monday, December 29, 2008 1:52:00 PM
Rank: Member


Joined: 6/18/2008
Posts: 353
Yes u need to review the design to fit that budget or review the budget. 4 Qs,contractor refs contact pwacha@gmail.com.
Happy 2009!

theu
luttz
#4 Posted : Monday, December 29, 2008 3:23:00 PM
Rank: Member


Joined: 3/18/2008
Posts: 377
Thanks guys.



Happy new year.
"You've never lived until you've almost died; for those who have fought for it, life has a flavour the protected will never know."
Kaigangio
#5 Posted : Monday, December 29, 2008 3:27:00 PM
Rank: Elder


Joined: 2/27/2007
Posts: 2,768
are you planning for a maisonnet or a bungalow?

NEVER TALK OF A RHINO IF THERE IS NO TREE NEAREBY - ZULU PROVERB
...besides, the presence of a safe alone does not signify that there is money inside...
luttz
#6 Posted : Monday, December 29, 2008 11:40:00 PM
Rank: Member


Joined: 3/18/2008
Posts: 377
Masionette bro
"You've never lived until you've almost died; for those who have fought for it, life has a flavour the protected will never know."
Kaigangio
#7 Posted : Tuesday, December 30, 2008 9:05:00 AM
Rank: Elder


Joined: 2/27/2007
Posts: 2,768
to start with i think the floor area seems to me to be far too small for a maisonette. 3600sq.ft works out to be only 108sq.m for both the floors (downstairs and upstairs) meaning that each floor will have on average of 54sq.m. What amenities do you intend to have in the building? that is no. of bedrooms,toilets,bathrooms etc.

NEVER TALK OF A RHINO IF THERE IS NO TREE NEAREBY - ZULU PROVERB
...besides, the presence of a safe alone does not signify that there is money inside...
doh
#8 Posted : Tuesday, December 30, 2008 9:18:00 AM
Rank: Member


Joined: 4/15/2008
Posts: 58
Am getting 334.450944sqm.

info is money
Kaigangio
#9 Posted : Tuesday, December 30, 2008 9:35:00 AM
Rank: Elder


Joined: 2/27/2007
Posts: 2,768
correction

sorry,i have recalculated and noted the fallacy. it is exactly 324 sq.m. amenities please...


NEVER TALK OF A RHINO IF THERE IS NO TREE NEAREBY - ZULU PROVERB
...besides, the presence of a safe alone does not signify that there is money inside...
luttz
#10 Posted : Tuesday, December 30, 2008 12:21:00 PM
Rank: Member


Joined: 3/18/2008
Posts: 377
Bro,

Sorry was not on my desk. I am looking at lounge,study room,kitchen,bar,dinning,guest bedroom(self contained) and small store on the first floor. Seconf floor has 3 bedrooms (one master)all ensuite and family room. All bedrooms open up to balconies.


"You've never lived until you've almost died; for those who have fought for it, life has a flavour the protected will never know."
Kaigangio
#11 Posted : Tuesday, December 30, 2008 12:40:00 PM
Rank: Elder


Joined: 2/27/2007
Posts: 2,768
then just give it an average of 25k per sq.m which works out to 8.1m for the total construction assuming that you will use average finishes and cheap electrical and plumbing fittings and accessories. The shorter the span of construction the better.

NEVER TALK OF A RHINO IF THERE IS NO TREE NEAREBY - ZULU PROVERB
...besides, the presence of a safe alone does not signify that there is money inside...
luttz
#12 Posted : Tuesday, December 30, 2008 2:07:00 PM
Rank: Member


Joined: 3/18/2008
Posts: 377
Boss!

Thank you so much

Can you please get in touch with me on luttah@yahoo.com or lutalala@un.org

Your advise appreciated.

Luttz
"You've never lived until you've almost died; for those who have fought for it, life has a flavour the protected will never know."
simonkabz
#13 Posted : Wednesday, December 31, 2008 5:30:00 AM
Rank: Elder


Joined: 3/2/2007
Posts: 8,776
Location: Cameroon
@ luttz,is ua other name polycarp? Just curious,u sound lyk a dude i knw,fm MHS

You never know what u can get away with until u try it!
TULIA.........UFUNZWE!
Obi 1 Kanobi
#14 Posted : Thursday, February 05, 2009 11:39:00 PM
Rank: Elder


Joined: 7/23/2008
Posts: 3,017
Hi good people,

Can someone give me a breakdown of the process of putting up a 3 bedroomed house,simple thing.

I know its a big ask but I am sure there's a contractor somewhere here with a bit of time to burn.

Kindly post the process from A-Z with material and labour needs for a standard hse with decent (not expensive) finishing.


I guess if you can't win with facts,you can always pen bile-laced,xenophobic rants to distract everyone.
"The purpose of bureaucracy is to compensate for incompetence and lack of discipline." James Collins
Djagame
#15 Posted : Friday, February 06, 2009 8:52:00 AM
Rank: Member


Joined: 12/10/2008
Posts: 68
Location: Nairobi
@obi 1 kanobi

Ideal process is a s follows:


Identify an architect (lead consultant)
Come up with a design brief (You and architect)
Site visit by architect - important as site features may determine/influence overall design
Come up with design upon consultation and input from both parties
Approve design after which architect picks other conultants (Engineers,surveyors,contractors etc)
Quantity surveyor produces bill of quantities (gives cost estimate of construction according to design) after input from consultants
After your assent of the above the drawings are taken for approval to city/county council
Once approved architect sends contractor to site to commence construction. (You may choose to work with your own contractor)
During construction architect to pay site visits to ensure construction being carried out according to plan or make necessary changes
Upon completion of construction city/council officers to approve - rarely happens
E & O. E.

To help you out in budgeting cost estimates for residential construction ranges from KShs 25,000.00-KShs 32,000.00 per square metre depending on the finishes.

You can do away with some of the above but absolute musts are pick an architect to do the design and also get your design approved.

Hope this helps and for more details send a mail to info@modelsandrenders.com



'Whatever can go wrong will go wrong,and at the worst possible time,in the worst possible way.' - Murphy

"We do not inherit the earth from our ancestors, we borrow it from our children" Native American Proverb
Gems
#16 Posted : Friday, February 06, 2009 9:45:00 PM
Rank: Member


Joined: 4/16/2008
Posts: 16
Location: California. US
Does anyone have estimates on the architectural both physical and structural. my plan is to construct a 2-4storey building for univ student hostel or apartments 1 and 2 bedrooms. I have plots at Annex campus of Moi univ,Eldoret. Do you know any Credible constructors that you guys have worked with. Any advise from people who are experienced in this? Its my very first project and as a lady,am afraid people will take advantage and overcharge me. Any helpful info will be appreciated

Gems
Obi 1 Kanobi
#17 Posted : Saturday, February 07, 2009 12:54:00 AM
Rank: Elder


Joined: 7/23/2008
Posts: 3,017
Thanks Djagame

Will email with more defnite questions.


I guess if you can't win with facts,you can always pen bile-laced,xenophobic rants to distract everyone.
"The purpose of bureaucracy is to compensate for incompetence and lack of discipline." James Collins
achy
#18 Posted : Saturday, February 07, 2009 12:28:00 PM
Rank: Member


Joined: 12/9/2007
Posts: 7
@ Gem,

kindly get in touch isaiahkiburi@yahoo.com,Can get u some valuable tips.


Not the best,but not like the rest.
Gideonboots
#19 Posted : Sunday, February 08, 2009 4:21:00 PM
Rank: Member


Joined: 12/27/2006
Posts: 17
@ achy

kindly give estimates as asked by Gem,so that we all benefit.

But for finer details she can email you.

Thanks guys


Hand that Giveth Receiveth
Gems
#20 Posted : Sunday, February 08, 2009 9:04:00 PM
Rank: Member


Joined: 4/16/2008
Posts: 16
Location: California. US
@achy,
I will email you asap.
thanks everyone,i have learned a thing or two

Gems
Users browsing this topic
Guest (5)
2 Pages12>
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.