At 25 bob per sq M,you are good to go. Am putting up a house in one of the surburbs and so far my costs have been as follows:
1. Mobilization,basic fencing,site house,trees etc: 400k
2. Foundation: Black cotton soil: 1.5M
3. Walling including 1st flr slap: 850k
4. Roofing: 1.2m
Am yet to touch finishing but this is where the money goes so I hear. I have worked with QS all through so I have all the house estimates. My house size is about 350sqM. Talk to me if you need further tips: